Please fill out the following form to request a change in the current configuration of an instrument located in the Nuclear and Chemical Science Core Facility.

Instrumentation Configuration Change Request

Name(Required)
Email(Required)
Instrument for which a change in configuraton is requested for:(Required)
MM slash DD slash YYYY
Please pick a date at least 8 days in the future, as it is NUCS Core Facility policy to provide users 7 days notice of an instrument configuration change.
Time new configuration must be ready:(Required)
:
Please be aware that a change in instrument configuration can take between 30 minutes to 4 hours, depending on the current instrument configuration and the requested instrument configuration.
Is the a recurring request?(Required)
If yes, include times/dates in the comments section.